|
|
 |
|

Dry sump tank |

View over rear wing |
Set up at edmomton Indy |
|

Air box hooked up |
Windows going in |

Passenger side view |
|

fuel pressure regulator |

Drivers side crush zone |

Test Arrbox is done |
|

Driveshaft and cv joint |

Drivers side view of engine bay |

Building up test Airbox |
|

First Test Header is done |

New Cable throtle body and fuel rail mounted |

Muffler mounted |
|

Half the header built |

This one is easy |

Closer look |
|

Rear mounting fitted and engine bolted up |

Drivers side engine mount |

Passenger side engine mount and start of header |
|

Hi tech transaxle cart |

Here goes the first fit |

Transaxle in possition |
|

Bell housing lines up great |

Installing drive flanges and input shaft |

Clutch throw out bearing installed |
|

Stock K20 with the dry sump system fitted |

Elite TXL-250 6 speed sequential transaxle |

Type 1 drive flanges ready to install |